The check passed A522 module # 16 list (ELBA, 06.10.1998)
Label 26
All tests are O'k.
Note!- PS COM - EARTH ripple = 52mV (! 10nF || 10K )
- ripple (peak to peak):
- no cable:
--- |
D5 |
L5 |
A5 |
A2 |
BIAS |
N-side |
18mV |
--- |
16mV |
14mV |
36mV |
P-side |
16mV |
--- |
18mV |
18mV |
--- |
- with cable:
--- |
D5 |
L5 |
A5 |
A2 |
BIAS |
N-side |
not wrtn |
not wrtn |
not wrtn |
not wrtn |
not wrtn |
P-side |
30mV |
not wrtn |
not wrtn |
not wrtn |
--- |
- The slew#1 (with cable), slew#2 and brief tests were skiped.
- There was very big T'C (about 80C) with no loads! After duty cycle adjustment (to be 50%*50%) -> T below 60C.
LBNL , 21-24.11.98. , D.Gamba , PierPaolo Trapani , A.Smol .
- H3.35 , 4x4 , no Si , 100nS :
N-side noise=1.290 (mean=1.294,rms=0.017); P-side noise=1.250 (mean=1.264, rms=0.009)
- H02-PI , 7x7 , Si , 100nS :
N-side noise=1.659 (mean=1.657,rms=0.019); P-side noise=1.430(mean=1.443,rms=0.0225)
LBNL , 03-12 february 99 , D.Gamba , PierPaolo Trapani , A.Smol .
- H02-PI, 7x7, Si, L2B, setup file - 1008, 100nS :
N-side noise=1.534(mean=1.504,rms=0.0119);P-side noise=1.313(mean=1.315,rms=0.0134)
Maintained by Smol Andrei
INFN