The check passed A522 module # 23 list (ELBA, 22.10.1998)
Label 30
All tests (done by Maurizio , CAEN staff) are O'k.
Note!- PS COM - EARTH ripple (peak to peak) = 16mV (! 10nF || 10K)
- ripple (peak to peak):
- no cable :
--- |
D5 |
L5 |
A5 |
A2 |
BIAS |
N-side |
47mV |
25mV |
20mV |
30mV |
35mV |
P-side |
36mV |
19mV |
23mV |
30mV |
--- |
- The slew#2 and brief tests were skiped. OVV test was done with no cable.
LBNL , 21-24.11.98. , D.Gamba , PierPaolo Trapani , A.Smol .
- H3.35 , 4x4 , no Si , 100nS :
N-side noise=1.290(mean=1.294,rms=0.017);P-side noise=1.259(mean=1.264,rms=0.009)
- H02-PI , 7x7 , Si , 100nS :
N-side noise=1.678(mean=1.657,rms=0.019); P-side noise - missed
LBNL , 03-12 february 99 , D.Gamba , PierPaolo Trapani , A.Smol .
- H02-PI, 7x7, Si, L2B, setup file - 1008, 100nS :
N-side noise=1.500(mean=1.504,rms=0.0119);P-side noise=1.338(mean=1.315,rms=0.0134)
!!! IR-2 , 30.04.99, - Bias monitoring: Umon=Uset - 2V !!! Calibration? EEPROM??
Maintained by Smol Andrei
INFN