The check passed A522 module # 5 list (27.07.1998)
Label 6
All tests are O'k.
Note! - The ripple (with cable), slew#1 (with cable), slew#2 and brief tests were skiped.
- D5P: Uset=5.0V , but Umeas=4.7V. F.Neri did something - it's O'k.
- After LBNL trip (noise was 2.5 instead of 1.9...2.0, ripple "center tap - earth"=~400mV), september 1998.
CAEN, 02.10.98.:
- MOSFET was broken
- 10 nF b/w P.S.com and Earth.
Pisa, 16.10.98.: Good noise performance with 10nF (H3.10 and one hybrid with silicon).
LBNL , 03-12 february 99 , D.Gamba , PierPaolo Trapani , A.Smol .
- H02-PI, 7x7, Si, L2B, setup file - 1008, 100nS :
N-side noise=1.493(mean=1.504,rms=0.0119);P-side noise=1.332(mean=1.317,rms=0.0134)
Maintained by Smol Andrei
INFN