The check passed A522 module # 60 list (ELBA, 17.12.1998)
Label 65
All tests (done by Maurizio , CAEN staff) are O'k.
Note!- PS COM - EARTH ripple (peak to peak) = 11mV (! 10nF || 10K)
- ripple (peak to peak):
- with cable :
--- |
D5 |
L5 |
A5 |
A2 |
BIAS |
N-side |
11mV |
13mV |
13mV |
12mV |
16mV |
P-side |
19mV |
18mV |
17mV |
20mV |
--- |
- The slew#2 and brief tests were skiped.
LBNL , 03-12 february 99 , D.Gamba , PierPaolo Trapani , A.Smol .
- H02-PI, 7x7, Si, L2B, setup file - 1008, 100nS :
N-side noise=1.501(mean=1.504,rms=0.0119);P-side noise=1.314(mean=1.315,rms=0.0134)
Maintained by Smol Andrei