The check passed A522 module # 9 list (27.07.1998)
Label 9
All tests are O'k.
Note! - The ripple (with cable), slew#1 (with cable), slew#2 and brief tests were skiped.
- The module has been validated with one side powered silicon at LBNL (september, 1998)
LBNL , 21-24.11.98. , D.Gamba , PierPaolo Trapani , A.Smol .
- H02-PI , 7x7 , Si , 100nS :
N-side noise=1.704(mean=1.657,rms=0.019);P-side noise=1.429(mean=1.443,rms=0.0225)
LBNL , 03-12 february 99 , D.Gamba , PierPaolo Trapani , A.Smol .
- H02-PI, 7x7, Si, L2B, setup file - 1008, 100nS :
N-side noise=1.507(mean=1.504,rms=0.0119);P-side noise=1.293(mean=1.315,rms=0.0134)
Maintained by Smol Andrei
INFN